Loading HDPE (High-Density Polyethylene) geomembranes into containers requires meticulous planning and execution to ensure the material's integrity and efficient space utilization. Geomembranes are critical in various engineering projects, particularly in environmental protection, water containment, and waste management. Here we will introduce the comprehensive steps and considerations for properly loading HDPE geomembranes into a standard 20-foot or 40-foot shipping container.
Usual size of the geomembranes
The roll size of the hdpe geomembranes can be customized according to your project needs, the width can be 1m-9.5m, the length can be 50m, 100m, 150m or customized. But the perfect roll width is 5.8m, because the length of 20ft container is 5.89m, and the length of 40ft container is 12m, so width 5.8m can be loaded maximum quantity, which will save the transportation cost for you.
The size of the container
40-foot Standard Container:
The above picture is the mornal 40ft container size.
• External Length: 40 feet (12.19 meters)
• External Width: 8 feet (2.44 meters)
• External Height: 8 feet 6 inches (2.59 meters)
• Internal Length: 39 feet 6 inches (12.03 meters)
• Internal Width: 7 feet 8 inches (2.33 meters)
• Internal Height: 7 feet 10 inches (2.39 meters)
• Door Width: 7 feet 8 inches (2.34 meters)
• Door Height: 7 feet 5 inches (2.28 meters)
• Volume: 2,390 cubic feet (67.7 cubic meters)
• Maximum Gross Weight: 67,200 pounds (30,480 kilograms)
40-foot High Cube Container:
The above picture is the high cube 40ft container size.
• External Length: 40 feet (12.19 meters)
• External Width: 8 feet (2.44 meters)
• External Height: 9 feet 6 inches (2.90 meters)
• Internal Length: 39 feet 6 inches (12.03 meters)
• Internal Width: 7 feet 8 inches (2.33 meters)
• Internal Height: 8 feet 10 inches (2.69 meters)
• Door Width: 7 feet 8 inches (2.34 meters)
• Door Height: 8 feet 5 inches (2.56 meters)
• Volume: 2,700 cubic feet (76.5 cubic meters)
• Maximum Gross Weight: 67,200 pounds (30,480 kilograms)
Loading Preparation
1. Assess the Container
Inspect the Container: Before loading, thoroughly inspect the container for cleanliness and structural integrity. Ensure there are no sharp edges, debris, or contaminants that could damage the geomembrane.
Determine Container Size: Depending on the quantity of HDPE geomembrane rolls, decide whether to use a standard or high cube container. High cube containers offer an additional foot of vertical space, which can be advantageous for maximizing load capacity.
2. Plan the Loading Sequence
Create a Loading Plan: Develop a detailed loading plan that includes the number of rolls, their dimensions, and the sequence in which they will be loaded. This helps in efficient space utilization and prevents any last-minute confusion.
Use Loading Tools: Gather necessary loading tools such as forklifts, pallet jacks, and loading ramps. Ensure all equipment is in good working condition and operators are trained.
Loading Process
1. Prepare the Geomembrane Rolls
Check Roll Integrity: Inspect each HDPE geomembrane roll for any damage or defects. Ensure that rolls are tightly wound and properly labeled.
Protective Packaging: If not already done, wrap the rolls in protective material such as plastic or canvas to safeguard them from moisture, dust, and mechanical damage during transit.
2. Arrange Rolls for Loading
Vertical Loading: For smaller rolls, consider vertical loading to maximize container space. Place the rolls upright and secure them with straps or braces to prevent movement.
Horizontal Loading: Larger rolls should be loaded horizontally. Place the heaviest rolls at the bottom and lighter ones on top to maintain stability.
3. Utilize Pallets and Dunnage
Palletize Rolls: Place rolls on sturdy pallets to facilitate easy loading and unloading. Ensure that pallets are in good condition and can support the weight of the rolls.
Use Dunnage: Insert dunnage (padding material) between rolls and along the container walls to prevent shifting during transport. This can include foam, wood blocks, or air-filled bags.
4. Load the Container
Position the Rolls: Using a forklift or pallet jack, carefully load the rolls into the container according to the loading plan. Start from the far end of the container and work towards the door to ensure even distribution.
Secure the Load: Once all rolls are in place, secure them with straps, ropes, or cargo nets. Pay special attention to securing the front and back ends of the load to prevent movement during transit.
Check Weight Distribution: Ensure the load is evenly distributed across the container’s floor to prevent tipping or imbalance during transport.
Final Checks and Documentation
1. Conduct Final Inspection
Inspect Load Security: Perform a final inspection to confirm that all rolls are securely fastened and there is no movement.
Seal the Container: Close and seal the container doors. Apply a container seal and record the seal number for documentation purposes.
2. Documentation
Prepare Shipping Documents: Complete all necessary shipping documents, including the bill of lading, packing list, and any required certificates.
Label the Container: Clearly label the container with the necessary shipping information, including destination, contents, and handling instructions.
Loading HDPE geomembranes into a container is a meticulous process that requires careful planning, proper equipment, and attention to detail. By following the steps outlined above, you can ensure the safe and efficient transport of HDPE geomembranes, minimizing the risk of damage and optimizing space utilization. Proper preparation, protective packaging, and secure loading are key to maintaining the integrity of the geomembranes and ensuring they arrive at their destination in optimal condition.
Haoyang Environmental is a leading geosynthetic products factory in China, the products we supply includes high quality hdpe geomembranes, woven/nonwoven geotextiles, geogrids, our factory covers an area of more than 230 acres, with over 50,000 square meters of standardized industrial workshops and 20 years experience in geosynthetics business, It possesses over 30 modern production lines for geosynthetic materials and has a total annual production capacity of 95,000 tons.
If you are interested in any of our products, feel free to contact Echo:
Phone/whatsapp: 0086-18853127527
Email: export@hygeosynthetics.com